Bid Review · Sample report

Kitchen remodel proposal review

  • Contractor: Northgate Kitchen & Bath LLC (fictional)
  • Proposal amount: $85,000
  • Oregon · About to sign
  • Checked against: 37 checks + Oregon rules
Download PDF

The sample report

Our verdict: Hold off and ask these first

Good start. Hold off until these are fixed.

It asks for 50% before any work, has no CCB license number, and lets changes be billed without a written change order. All of it is fixable with a few questions and a revised copy in writing.

23out of 1000100
Bid score
Fix before you sign
4
Questions to send
7
Already covered
1 of 22

What matters most

If you read nothing else, read these.

  1. 1

    $76,500paid once the cabinets are in

    You'd pay 90% before the job is close to done

    Half is due at signing and 40% more at cabinets, before counters, floors, plumbing and electrical. Ask for smaller payments tied to finished work.

    See what it says
  2. 2

    $20,500in allowances with no cap

    Extra charges don't need your signature

    Changes are "billed accordingly" with no signed change order, and the allowances don't say who pays if you go over. Get both in writing.

    See what it says
  3. 3

    No license number you can check

    There's no CCB number, address or phone, so you can't look up their license, bond or complaint history. Ask them to add it.

    See what it says

Cancelling and deposits vs Oregon law

Worth a question

We put the contract's cancellation and deposit terms next to what Oregon law and the federal Cooling-Off Rule allow, using the official text of each law.

  • Time to cancel

    Ask about it
    The contract says
    No cancel window stated
    Oregon law
    3 business days to cancel when the contract was sold at your home (ORS 83.710, 83.720, 83.730, 83.740, 83.750)

    The contract should tell you how long you have. Your right to cancel applies either way; ask them to add the notice and the cancellation form before you sign.

    ORS 83.710, 83.720, 83.730, 83.740, 83.750 (opens the official text)ORS 701.310 (opens the official text)Checked November 19, 2026

  • Deposit

    Ask about it
    The contract says
    $42,500 up front (50% of the price)
    Oregon law
    Oregon sets no limit on deposits

    Allowed in Oregon, but high: the 7 states that cap deposits allow 10% to 33% of the price. A smaller deposit, with payments tied to finished work, keeps you in a stronger spot.

Other cancel rights in Oregon law

These apply only in the situations described, such as a buyer 65 or older, a financed sale or an insurance-paid repair. Ask the contractor whether any of them covers your contract.

  • 3 business days: Written contracts with a licensed landscape contracting business (landscaping, possibly incl. retaining walls done by a landscape contractor) for work on property the person owns or leases. Effective Jan 2, 2024. ORS 671.627; OAR 808-002-0020 (opens the official text)
The contract's words
“50% deposit due upon signing ($42,500).”

Proposal #NG-2291, §5, page 2

This compares the contract's words with the law as written in official sources, last checked November 19, 2026. It isn't legal advice; for a binding answer about your contract, talk to a lawyer licensed in Oregon.

Checks for a kitchen remodel

8 to ask about

What a complete bid for a kitchen remodel usually spells out, beyond the standard checklist. These are trade practice, not law.

  • CabinetsCabinets are only an $18,000 allowance. The proposal doesn't name a brand or line, the box material (plywood or particleboard), the door style or finish, or say that installation is included.Ask about this

    Cabinets are only an $18,000 allowance. The proposal doesn't name a brand or line, the box material (plywood or particleboard), the door style or finish, or say that installation is included.

    What the document says
    “Cabinets: $18,000 allowance.”

    Proposal #NG-2291, §3, page 2

    Ask: What cabinet brand and line does the $18,000 allowance assume, are the boxes plywood or particleboard, and is installation included?

  • Electrical for a kitchen'Updates as needed' doesn't promise the dedicated appliance circuits and GFCI outlets at the counters that a kitchen remodel normally needs, or say whether the electrical panel has room for them.Ask about this

    'Updates as needed' doesn't promise the dedicated appliance circuits and GFCI outlets at the counters that a kitchen remodel normally needs, or say whether the electrical panel has room for them.

    What the document says
    “2.5 Electrical updates as needed.”

    Proposal #NG-2291, §2.5, page 1

    Ask: Will you add dedicated circuits for the dishwasher, microwave and fridge and GFCI outlets at every counter, and have you checked that the panel has room?

  • Appliances and hookupsThe proposal doesn't say who supplies the appliances or whether installing and hooking them up (dishwasher, disposal, the fridge's water line, any gas line) is included.Not in your documents

    The proposal doesn't say who supplies the appliances or whether installing and hooking them up (dishwasher, disposal, the fridge's water line, any gas line) is included.

    Ask: Who supplies the appliances, and are installation and all hookups, including the fridge water line, included in the price?

  • Range hoodNo range hood is mentioned. If you want one vented outside, the duct route and the wall or roof opening should be in the scope.Not in your documents

    No range hood is mentioned. If you want one vented outside, the duct route and the wall or roof opening should be in the scope.

    Ask: Is a range hood included, and will it vent outside? If so, where does the duct run?

  • Drywall, paint and trimThere's nothing about patching drywall, painting or trim after demolition, so you could be left to finish the walls yourself.Not in your documents

    There's nothing about patching drywall, painting or trim after demolition, so you could be left to finish the walls yourself.

    Ask: Are drywall repair, paint and trim after demolition included, or will I need to hire that out?

  • Lead timesCabinets and quartz often take weeks to arrive, and the proposal doesn't say when they'll be ordered or what happens to the schedule and payments while you wait.Not in your documents

    Cabinets and quartz often take weeks to arrive, and the proposal doesn't say when they'll be ordered or what happens to the schedule and payments while you wait.

    Ask: When will you order the cabinets and counters, how long do they take to arrive, and will any payment be due while we wait for them?

  • Flooring under the cabinetsNew LVP is listed, but the proposal doesn't say whether it runs under the new cabinets or stops at them, or how gaps from the old layout get patched.Unclear

    New LVP is listed, but the proposal doesn't say whether it runs under the new cabinets or stops at them, or how gaps from the old layout get patched.

    What the document says
    “2.4 Install new LVP flooring in kitchen area.”

    Proposal #NG-2291, §2.4, page 1

    Ask: Does the LVP go under the cabinets or stop at them, and how will you handle spots where the old cabinets sat?

  • Plumbing moves and permitsPlumbing fixtures are covered by an allowance, but the proposal doesn't say whether the sink or any lines move, or who gets the plumbing permit if they do.Unclear

    Plumbing fixtures are covered by an allowance, but the proposal doesn't say whether the sink or any lines move, or who gets the plumbing permit if they do.

    What the document says
    “Light fixtures and plumbing fixtures: $2,500 allowance.”

    Proposal #NG-2291, §3, page 2

    Ask: Is the sink staying where it is? If any plumbing moves, is that work and its permit in the $85,000?

  • DemolitionTearing out the old cabinets, countertops and flooring is included in the scope.Covered

    Tearing out the old cabinets, countertops and flooring is included in the scope.

    What the document says
    “2.1 Demo existing cabinets, countertops and flooring.”

    Proposal #NG-2291, §2.1, page 1

Your next step

  1. 1Send your contractor the 7 questions below. It takes two minutes.
  2. 2Don't sign or pay a deposit until the answers are in a revised copy, in writing.
Get the 7 questions

Your options

It's your call. Here's what each choice means and what it costs you.

  • A good place to start

    Ask for changes before you sign

    Send them the 7 questions above and see what they change in writing.

    Takes a few days. Asking is normal, and a good contractor expects it.

  • Get another bid to compare

    Ask one or two other licensed contractors to price the same work.

    Takes time, but shows you whether this price and these terms are normal.

  • Sign the bid as it is

    If you sign this bid, it becomes your contract. It doesn't say you can cancel, so ask before you sign.

    The 7 open questions above stay open.

  • Pass on this one

    You owe nothing until you sign. A polite no thanks is enough.

    You start over, but you're not locked into terms you're unsure about.

Read the full summary

Good news first: you caught this before signing, and the proposal already lists the main work and a payment schedule, which gives you something solid to work from. It's a three-page, unsigned proposal for an $85,000 kitchen remodel, and it leaves out several things you would want in writing before you sign. The biggest gaps are that it has no contractor license number, address or phone, and no insurance details. Like most proposals, it also leaves out Oregon's notices and your cancellation rights; if you sign it, it becomes your contract, so ask for those too. The payment plan has you paying 90% ($76,500) by the time the cabinets are in, and the work after that includes countertops, flooring, plumbing and electrical. Scope, materials, allowances, extra work and the warranty are all described very loosely. Ask the contractor to add these points in writing, and you'll be in a much stronger spot before you sign.

Every check, in detail

All 37 checks, most urgent first. Checks about the same thing are combined into one item with one question. Tap a group, then any item for the exact words.

Fix before you signThese protect your money most.4
  • 4×Payments that follow the workWhat will the 50% deposit pay for, and would you take a smaller one tied to ordering materials? Can the rest be split into payments due as each stage is finished (demo, cabinets, countertops, flooring), with the last one held until the work is done and I've signed off?P3P4P1P2

    Ask your contractor

    What will the 50% deposit pay for, and would you take a smaller one tied to ordering materials? Can the rest be split into payments due as each stage is finished (demo, cabinets, countertops, flooring), with the last one held until the work is done and I've signed off?

    What we found (4 checks)

    • P3Payments vs. work doneAsk about this

      By the cabinet installation milestone, $76,500 (90%) would be paid. Countertops, flooring, electrical, plumbing and the final connections would still be left. The payments get ahead of the work.

      What your document says
      “40% due upon cabinet installation ($34,000).”

      Proposal #NG-2291, §5, page 2

    • P4Final paymentAsk about this

      A 10% final payment ($8,500) is held until 'completion', but there is no walkthrough, punch list or final inspection step that has to happen before it is due.

      What your document says
      “10% due upon completion ($8,500).”

      Proposal #NG-2291, §5, page 2

    • P1DepositUnclear

      The deposit is 50% of the price ($42,500). We didn't find an Oregon statewide deposit limit in the official sources we reviewed, so we can't compare it to a state rule. A 50% deposit is large, so it is worth asking about.

      What your document says
      “50% deposit due upon signing ($42,500).”

      Proposal #NG-2291, §5, page 2

    • P2When payments are dueAsk about this

      Only one of the three payments is tied to a stage you can check (cabinet installation). The other two are due on signing and on 'completion', not on finished work.

      What your document says
      “40% due upon cabinet installation ($34,000).”

      Proposal #NG-2291, §5, page 2

  • 5×No extra charges without your OKIs the $85,000 fixed or an estimate, and can the contract list everything that could change it? Do the allowances cover delivery, tax and installation, and how are overages and credits handled? Can we agree that no extra work, including hidden damage found after demo, starts until we both sign a change order showing its price and schedule impact? And what are your hourly rates and material markup?S3C1P6S5C3

    Ask your contractor

    Is the $85,000 fixed or an estimate, and can the contract list everything that could change it? Do the allowances cover delivery, tax and installation, and how are overages and credits handled? Can we agree that no extra work, including hidden damage found after demo, starts until we both sign a change order showing its price and schedule impact? And what are your hourly rates and material markup?

    What we found (5 checks)

    • S3AllowancesAsk about this

      Two allowances are listed, but the proposal does not say whether they include installation, delivery or tax, or what happens if your selections cost more or less. It is unclear whether the allowances are inside the $85,000.

      What your document says
      “Cabinets: $18,000 allowance. Light fixtures and plumbing fixtures: $2,500 allowance.”

      Proposal #NG-2291, §3, page 2

    • C1Change orders in writingAsk about this

      The proposal says changes will be billed, but it does not require a written, signed change order before extra work starts.

      What your document says
      “Any changes requested by homeowner will be billed accordingly.”

      Proposal #NG-2291, §7, page 3

    • P6Total priceAsk about this

      One total price is stated, but the proposal doesn't say whether it's a fixed price or an estimate, or list what can change it.

      What your document says
      “Total contract price: $85,000.”

      Proposal #NG-2291, §4, page 2

    • S5Hidden conditionsNot in your documents

      The proposal does not say what happens if hidden problems, such as rot, mold or bad wiring, are found after demolition: who decides, how it will be priced, or whether work stops.

    • C3Pricing for extra workNot in your documents

      No hourly rates, material markup or unit prices are given for extra work.

  • 5×Exactly what you're gettingCan the contract spell out the work (outlets, circuits and lights, the number of cabinets, square footage of counters and flooring), name the brand, line, color and grade of the cabinets, quartz, LVP and fixtures, list what's not included (painting, patching, backsplash, appliance hookup, trim), cover debris removal and cleanup, and include everything we discussed about layout, selections and extras?S1S2D1S6S4

    Ask your contractor

    Can the contract spell out the work (outlets, circuits and lights, the number of cabinets, square footage of counters and flooring), name the brand, line, color and grade of the cabinets, quartz, LVP and fixtures, list what's not included (painting, patching, backsplash, appliance hookup, trim), cover debris removal and cleanup, and include everything we discussed about layout, selections and extras?

    What we found (5 checks)

    • S1Scope of workAsk about this

      Scope lines do not give counts, sizes or locations. There are no cabinet counts, countertop square footage, flooring area, or electrical outlet and circuit counts. 'As needed' leaves the electrical scope open-ended.

      What your document says
      “2.5 Electrical updates as needed.”

      Proposal #NG-2291, §2.5, page 1

    • S2Materials namedAsk about this

      Materials are not named by brand, model, color or grade. Cabinets are only 'see allowance', and the quartz and LVP are not identified. Plumbing fixtures are not described.

      What your document says
      “2.4 Install new LVP flooring in kitchen area.”

      Proposal #NG-2291, §2.2–2.4, page 1

    • D1Promises in writingAsk about this

      The project overview relies on 'discussions with homeowner', which are not written in the proposal. Anything promised in conversation or by text should be added to the contract.

      What your document says
      “Remove existing kitchen and install new kitchen per discussions with homeowner.”

      Proposal #NG-2291, §1, page 1

    • S6Demolition and cleanupUnclear

      Demolition is listed, but the proposal does not say who hauls away debris, what daily cleanup looks like, or whether a final cleaning is included.

      What your document says
      “2.1 Demo existing cabinets, countertops and flooring.”

      Proposal #NG-2291, §2.1, page 1

    • S4What's not includedNot in your documents

      There is no list of what is not included. Painting, patching walls, appliance hookup, backsplash, and moving or storing items are not mentioned.

  • 5×Who you're hiringCan you add your CCB license number, your legal business name as CCB lists it, your street address and phone to the contract, send current liability and workers' comp certificates and keep them in force, show me where to check that your license and bond are active, and tell me which trades you subcontract, to whom, and whether they're licensed?L2L1L3L4L5

    Ask your contractor

    Can you add your CCB license number, your legal business name as CCB lists it, your street address and phone to the contract, send current liability and workers' comp certificates and keep them in force, show me where to check that your license and bond are active, and tell me which trades you subcontract, to whom, and whether they're licensed?

    What we found (5 checks)

    • L2Business name, address and phoneAsk about this

      A business name is given, but there is no street address or phone number for the contractor. Oregon expects name, address, phone and CCB number on residential contracts.

      What your document says
      “Northgate Kitchen & Bath LLC”

      Proposal #NG-2291, page 1, header

      State source
    • L1License numberNot in your documents

      No contractor license (CCB) number appears anywhere in the proposal. Oregon expects residential contracts to show the CCB license number as it appears on CCB records.

      State source
    • L3InsuranceNot in your documents

      The proposal says nothing about liability insurance or workers' compensation, and does not say a certificate will be provided.

    • L4Bond or recovery fundNot in your documents

      The proposal does not mention a bond. Oregon licensed contractors carry a surety bond that can pay CCB-determined amounts, and the amount is limited and shared among claimants.

      State source
    • L5SubcontractorsNot in your documents

      The proposal does not say whether electrical or plumbing work will be done by subcontractors or by the contractor's own crew.

Worth asking aboutSmaller points to clear up in writing.1
  • W1WarrantyA workmanship warranty is mentioned, but with no length, no scope, and no claim process.

    Ask your contractor

    How long is your workmanship warranty, what does it cover and exclude, and how do I make a claim?

    • Ask about this

      A workmanship warranty is mentioned, but with no length, no scope, and no claim process.

      What your document says
      “Contractor warrants all workmanship.”

      Proposal #NG-2291, §8, page 3

Not in your documentsThings a good bid or contract spells out.1
  • R1Permits and inspectionsPermits are not mentioned, though the scope includes electrical and plumbing work.

    Ask your contractor

    Who pulls and pays for the permits and schedules the inspections, and are permit fees included in the $85,000?

    • Not in your documents

      Permits are not mentioned, though the scope includes electrical and plumbing work. It does not say who pulls permits, who pays for them, or who schedules inspections.

For the contractThis bid becomes your contract once you sign it. Ask whether they'll write a separate contract; either way, what you sign should have these.1
  • 9×When they write the contractIs this bid the final agreement, or will you write a separate contract?P5C2T2T3R2R3R4W2W3

    Ask your contractor

    • Is this bid the final agreement, or will you write a separate contract?
    • Will you provide signed lien releases from you, your subcontractors and suppliers with each payment?
    • Will each change order show the price and any effect on the schedule before I sign it?
    • What delays do you count as excusable, and how and when will you tell me about them?
    • Who is my main contact, and how often will I get updates?
    • Can you give me the three required Oregon notices before I sign, and have me sign that I received them?
    • Will you add a plain statement of my cancellation rights, and tell me whether this contract is covered by the one-day or three-day rule?
    • Does your standard contract include any arbitration, attorney-fee or venue terms that are not in this proposal?
    • Will you give me all manufacturer warranties and registration paperwork at the end?
    • Can you add a final walkthrough, a written punch list and my sign-off before the job counts as complete?

    What we found (9 checks)

    • P5Lien releasesFor the contract

      The proposal does not mention lien releases or waivers from the contractor, subcontractors or suppliers. It also does not mention the Oregon lien notice (see R2).

      State source
    • C2Price and time of each changeFor the contract

      The proposal does not say that change orders will show the added cost and any change in the completion date.

    • T2DelaysFor the contract

      The proposal does not say what counts as an allowed delay, such as weather, permits or material shortages, or how you will be told about delays.

    • T3Contact and updatesFor the contract

      No point of contact or update schedule is given.

    • R2State noticesFor the contract

      No required notices are attached or mentioned. For residential work over $2,000 in Oregon, the contractor must give the owner three notices and keep proof of receipt: the Information Notice to Owner About Construction Liens, the Consumer Protection Notice and the Notice of Procedure.

      State source
    • R3Right to cancelFor the contract

      The proposal has no cancellation language. Oregon gives a one-day right to cancel an initial residential construction contract (written notice before midnight of the next business day). A three-day right applies to home-solicitation contracts made away from the seller's permanent place of business. Which one applies depends on where you sign.

      State source
    • R4DisputesFor the contract

      The proposal has no clause on arbitration, mediation, attorney fees or venue, so those terms are not stated here.

    • W2Manufacturer warrantiesFor the contract

      The proposal does not say whether manufacturer warranties and registration papers will be handed over for cabinets, quartz, flooring or fixtures.

    • W3When the job counts as doneFor the contract

      The proposal does not define when the job counts as complete. There is no walkthrough, written punch list or sign-off step.

Already coveredYour documents handle these well.1
  • T1Start and finish datesThe proposal gives an approximate start and a duration counted from signing.

    Covered

    The proposal gives an approximate start and a duration counted from signing. Both are estimates, so it is still worth asking for firmer dates.

    What your document says
    “Work to begin approximately 2–3 weeks after signing. Estimated duration 6–8 weeks.”

    Proposal #NG-2291, §6, page 2

    Ask: Can you give a target start date and a target completion date in writing?

Doesn't apply hereNot relevant to this project or stage.6
  • S7Design matches the scopeNo inspiration photos or design documents were provided, so there is nothing to compare to the written scope.

    Doesn't apply

    No inspiration photos or design documents were provided, so there is nothing to compare to the written scope.

  • S8Comparing the bidsOnly one proposal was provided, so there is nothing to compare line by line.

    Doesn't apply

    Only one proposal was provided, so there is nothing to compare line by line. If you get other bids, compare scope, materials and allowances side by side.

  • P7Invoices vs. the agreementNo invoices were provided, and the job has not started.

    Doesn't apply

    No invoices were provided, and the job has not started. When invoices arrive, check each line against the contract or a signed change order.

  • D2Dated photosNo photos were provided and the job has not started.

    Doesn't apply

    No photos were provided and the job has not started. Consider taking dated 'before' photos of the kitchen now and tying later photos to contract sections.

  • D3Timeline of eventsThe job is at the pre-signing stage, so there is no timeline yet.

    Doesn't apply

    The job is at the pre-signing stage, so there is no timeline yet. Start a log with the signing date, payments, change orders and conversations.

  • D4Before you file a complaintNot needed before signing.

    Doesn't apply

    Not needed before signing. For later: Oregon requires written notice of intent to file a complaint, sent by certified mail, and the CCB can't accept the complaint until 30 days after that notice.

    State source
How the score works

Every checklist item that applies earns points: full points when your documents cover it, some when it's a smaller question, none when something important is missing. The score always agrees with our verdict: 0 to 44 means hold off, 45 to 74 means fix a few things first, 75 and up means ready to sign.

OwnersBack reviews documents for clarity and common gaps against the OwnersBack Checklist and the state sources linked above. This report is not legal advice, a home inspection, an engineering opinion or a code review. A person on our team checked every item before delivery.

The 7 questions, ready to sendCopy, email or text them to the contractor in one tap.

Questions to send your contractor

7 questions

One question per issue, most important first. Where several checks were about the same thing, we combined them. Send them before you sign and keep the written answers with your contract.

Ask before you sign

  1. 1.Payments that follow the workWhat will the 50% deposit pay for, and would you take a smaller one tied to ordering materials? Can the rest be split into payments due as each stage is finished (demo, cabinets, countertops, flooring), with the last one held until the work is done and I've signed off?#P3 #P4 #P1 #P2
  2. 2.No extra charges without your OKIs the $85,000 fixed or an estimate, and can the contract list everything that could change it? Do the allowances cover delivery, tax and installation, and how are overages and credits handled? Can we agree that no extra work, including hidden damage found after demo, starts until we both sign a change order showing its price and schedule impact? And what are your hourly rates and material markup?#S3 #C1 #P6 #S5 #C3
  3. 3.Exactly what you're gettingCan the contract spell out the work (outlets, circuits and lights, the number of cabinets, square footage of counters and flooring), name the brand, line, color and grade of the cabinets, quartz, LVP and fixtures, list what's not included (painting, patching, backsplash, appliance hookup, trim), cover debris removal and cleanup, and include everything we discussed about layout, selections and extras?#S1 #S2 #D1 #S6 #S4
  4. 4.Who you're hiringCan you add your CCB license number, your legal business name as CCB lists it, your street address and phone to the contract, send current liability and workers' comp certificates and keep them in force, show me where to check that your license and bond are active, and tell me which trades you subcontract, to whom, and whether they're licensed?#L2 #L1 #L3 #L4 #L5

Get in writing before work starts

  1. 5.WarrantyHow long is your workmanship warranty, what does it cover and exclude, and how do I make a claim?#W1

Good to confirm

  1. 6.Permits and inspectionsWho pulls and pays for the permits and schedules the inspections, and are permit fees included in the $85,000?#R1
  2. 7.When they write the contractIs this bid the final agreement, or will you write a separate contract? Will you provide signed lien releases from you, your subcontractors and suppliers with each payment? Will each change order show the price and any effect on the schedule before I sign it? What delays do you count as excusable, and how and when will you tell me about them? Who is my main contact, and how often will I get updates? Can you give me the three required Oregon notices before I sign, and have me sign that I received them? Will you add a plain statement of my cancellation rights, and tell me whether this contract is covered by the one-day or three-day rule? Does your standard contract include any arbitration, attorney-fee or venue terms that are not in this proposal? Will you give me all manufacturer warranties and registration paperwork at the end? Can you add a final walkthrough, a written punch list and my sign-off before the job counts as complete?#P5 #C2 #T2 #T3 #R2 #R3 #R4 #W2 #W3
Email to contractorText to contractor

Tip: send by email so you have a dated, written record of the answers.

See the proposal we checkedThe fictional 3-page proposal behind this report.

Kitchen Remodel Proposal #NG-2291

§1 Project Overview

Remove existing kitchen and install new kitchen per discussions with homeowner.

§2 Scope of Work

2.1 Demo existing cabinets, countertops and flooring. 2.2 Install new cabinets (see allowance). 2.3 Furnish and install quartz countertops. 2.4 Install new LVP flooring in kitchen area. 2.5 Electrical updates as needed. 2.6 Plumbing: reconnect sink and dishwasher. 2.7 Paint kitchen walls.

§3 Allowances

Cabinets: $18,000 allowance. Light fixtures and plumbing fixtures: $2,500 allowance.

§4 Contract Price

Total contract price: $85,000.

§5 Payment Schedule

50% deposit due upon signing ($42,500). 40% due upon cabinet installation ($34,000). 10% due upon completion ($8,500).

§6 Schedule

Work to begin approximately 2–3 weeks after signing. Estimated duration 6–8 weeks.

§7 Changes

Any changes requested by homeowner will be billed accordingly.

§8 Warranty

Contractor warrants all workmanship.

§9 General Conditions

Contractor will leave job site broom clean at the end of each work day. Homeowner is responsible for removing personal items from the kitchen prior to start.

Comparing bids? See a side-by-sideHow two quotes really stack up once the gaps are counted.

Here's what your 3 bids look like side by side on OwnersBack

Sample comparison (fictional bids)

Three fictional kitchen bids, lowest price first. Anything a bid leaves out is marked in red, so you can see where you're missing things before you sign.

Where you're missing things

  • Ridgeway Home Co. $71,900Lowest price

    3 items missing, 1 term not stated

  • Cedar Line Builders $78,400

    Nothing missing

  • Northgate Kitchen & Bath $85,000

    3 items missing, 2 terms not stated

Swipe to see each bid, lowest price first →

Bid 1 of 3Ridgeway Home Co.

Ridgeway Home Co.

$71,900

Lowest price3 items missing, 1 term not stated
Deposit
$21,570 (30%) at signing
Payment schedule
30% / 60% at rough-in / 10% at completion
Warranty
2 years workmanship
Timeline
"Spring", no dates
Permits
Homeowner's responsibility
License number
CCB 230957
Allowances
Not stated
What's included
Demolition and haul-away
Demo and haul-away
Cabinets
Builder-grade, brand not named
Ridgeway's lower price includes cheaper, unnamed cabinets.
Quartz countertops
Furnished and installed
Tile backsplash
Not included
Two bids leave out the backsplash.
Electrical
Relocate 2 outlets
Plumbing
Reconnect sink
Flooring
Not included
Ridgeway doesn't include flooring.
Drywall repair and paint
Not included
Appliance install
Range and dishwasher only
Final cleanup
Included

Cedar Line Builders

$78,400

Deposit
$1,000 at signing
Payment schedule
5 milestones tied to inspections
Warranty
1 year workmanship, in writing
Timeline
Start Apr 7, 7 weeks
Permits
Contractor pulls and pays
License number
CCB 248113
Allowances
Cabinets $16,000
What's included
Demolition and haul-away
Demo, dumpster and haul-away
Cabinets
$16,000 allowance
Quartz countertops
Furnished and installed, 3 cm
Tile backsplash
Included, up to 30 sq ft
Electrical
4 new circuits, 8 can lights, GFCI outlets
Plumbing
Reconnect sink, dishwasher and fridge water line
Flooring
LVP, kitchen and dining
Drywall repair and paint
Patch, prime, paint walls and ceiling
Appliance install
Install 4 homeowner-supplied appliances
Final cleanup
Included

Northgate Kitchen & Bath

$85,000

3 items missing, 2 terms not stated
Deposit
$42,500 (50%) at signing
Payment schedule
50% / 40% at cabinets / 10% at completion
Warranty
"All labor guaranteed", no length
Timeline
Start in 2-3 weeks, 6-8 weeks
Permits
Not stated
License number
Not stated
Allowances
Cabinets $18,000; fixtures $2,500
What's included
Demolition and haul-away
Demo only, disposal not stated
Cabinets
$18,000 allowance
Quartz countertops
Furnished and installed
Tile backsplash
Not included
Two bids leave out the backsplash.
Electrical
"Updates as needed"
Plumbing
Reconnect sink and dishwasher
Flooring
LVP, kitchen only
Drywall repair and paint
Paint walls
Appliance install
Not included
Final cleanup
Not included

Gaps to close

  • Northgate:No license number or permits listed, and half the price is due at signing. Ask for both in writing, and for payments tied to finished stages.
  • Ridgeway:No flooring, backsplash or paint, and permits are left to you. Adding them could close most of the price gap.
  • Cedar Line:Cabinet allowance is $2,000 lower than Northgate's, so confirm what it buys.

Bottom line

Ridgeway looks cheapest, but it leaves out flooring, backsplash and paint and puts permits on you. Cedar Line covers the most and asks for the smallest deposit. Ask Ridgeway to price the missing items, and ask Northgate for its license number and a deposit you can live with.

Download as a spreadsheet

Excel, Google Sheets or Numbers. Add your own cost for what each bid leaves out.

Want this for your own project?

Upload your estimate, proposal or contract. We check it against every item above and your state's rules.

$99 per bid or contract. Report in 2 business days.

Sample Contractor Contract Review: $85,000 Kitchen Remodel | OwnersBack