Policies
Service limitations and disclaimers
Last updated: November 19, 2026
What OwnersBack is
OwnersBack provides educational reviews of residential home-improvement documents, such as estimates, proposals, contracts and change orders. We identify terms that appear unclear, incomplete or worth discussing, explain them in plain language, and suggest questions to ask. Our goal is to help you understand your documents and prepare for conversations with your contractor.
What OwnersBack is not
- Not legal advice. We are not a law firm and do not provide legal advice, legal opinions, or interpretations of whether a contract or any term is enforceable. No attorney–client relationship is created.
- Not an inspection. We do not inspect property and cannot identify hidden, concealed or physical defects.
- Not engineering or code certification. We do not provide licensed engineering services or certify compliance with building codes.
- Not verification. Unless a report expressly states that a specific check was performed, we have not verified any contractor's license, insurance, bonding, permits or inspection history.
- Not an approval. A clean report or a “Document review completed” certificate means our checklist review found nothing you need to fix in the documents before signing. It is not an approval or endorsement of the contractor, the price or the work.
- No guarantees. We do not guarantee contractor performance, project outcomes, cost savings, detection of every issue, or that disputes or litigation will be avoided.
How reports are prepared
We use software, including third-party AI models, to read documents, extract text and draft initial findings against our checklist. Every paid report is then reviewed, edited and approved by an OwnersBack reviewer before delivery. The Free Bid Check is automatic and is not reviewed by a person. Reports reflect only the documents and information you provide. If documents are incomplete, illegible or out of date, the report will be limited accordingly.
Price comparisons
Where we show how a bid's price compares with other bids, the comparison comes from anonymized bids other homeowners have uploaded, and it appears only when we have enough similar bids. It is a rough guide, not an appraisal or a judgment that a price is fair, because prices vary with scope, materials and site conditions.
Laws vary by location
Contractor licensing, deposit limits, cancellation rights, lien rights, permit requirements and consumer protections differ by state and local jurisdiction, and they change. Our guides, dispute pages and state rule pages are general information. Where a report or page mentions that rules may apply, confirm the requirements with the relevant official agency or a licensed professional where your project is located.
When to consult a professional
If your project involves a legal dispute, a significant contract decision, structural concerns, safety issues or code questions, consult a licensed attorney, engineer, home inspector or contractor as appropriate.