Skip to content
OwnersBack

Deposit limits by state

How much can a contractor ask for up front?

Some states cap the deposit on home improvement work. Most don't. Pick your state to see its rule in plain words, with the official source, and check your own deposit in a few seconds.

States checked against official sources. Last checked November 17, 2026.

Check your deposit

This compares your numbers with the rule's wording. It isn't legal advice, and some rules depend on details like your city, the type of job or a contractor's bond.

States with a deposit rule

Of the 50 states and DC, 13 have a rule on deposits or down payments for home improvement work. The wording below is a plain summary of each official source.

Tap a state to read its rule and source.

AZArizona

For repairs after a catastrophic storm on a home you live in, the contract can't require a down payment of more than 50% of the total contract price (A.R.S. 32-1158.02). Arizona law sets no general deposit cap for other home improvement work, but the contract must state any deposit (A.R.S. 32-1158).

Official source: Arizona Legislature, A.R.S. 32-1158.02, Residential construction contractsAll Arizona contractor rules

CACalifornia

A down payment on a home improvement contract may not exceed $1,000 or 10 percent of the contract price, whichever is less. The exception is a contractor with a blanket performance and payment bond on file with CSLB, which you can check on the license lookup.

Official source: CSLB, What Should I Look for in a ContractAll California contractor rules

FLFlorida

If a contractor takes more than 10% of the contract price as a first payment on residential work, it must apply for any needed permits within 30 days after you pay and start work within 90 days after the permits are issued, unless it has just cause or you agreed in writing to a longer period (Fla. Stat. 489.126(2)).

Official source: Florida Statutes 489.126, Moneys received by contractorsAll Florida contractor rules

KYKentucky

On a job expected to be paid from insurance, the contractor may not require any advance payment until your cancellation period has ended. If you cancel, the contractor must return all payments, deposits and notes within 10 days, though it may charge a reasonable amount for emergency work it already did (KRS 367.626).

Official source: KRS 367.626, Advance payments and returnsAll Kentucky contractor rules

MEMaine

The initial down payment is limited to no more than 1/3 of the total contract price (10 M.R.S. § 1487(5)).

Official source: 10 M.R.S. § 1487, Home construction contracts (Maine Legislature)All Maine contractor rules

MDMaryland

A contractor may not take any payment until the contract is signed, and may not accept a deposit of more than one-third of the contract price on or before the day the contract is signed (Md. Code, Bus. Reg. 8-617).

Official source: Maryland General Assembly, Business Regulation 8-617All Maryland contractor rules

MAMassachusetts

A contractor may not take an advance deposit larger than one-third of the total contract price, or the actual cost of special-order or custom materials that must be ordered in advance, whichever is greater (M.G.L. c. 142A, s. 2).

Official source: Massachusetts General Laws, Chapter 142A, Section 2All Massachusetts contractor rules

NVNevada

The initial down payment or deposit may not exceed the lesser of 10% of the total contract price or $1,000. The limit does not apply if the contractor has filed a $100,000 consumer protection bond with the Board or was granted relief from the license bond under NRS 624.270 (AB 39, 2023).

Official source: NSCB, AB39 Mandatory LanguageAll Nevada contractor rules

NYNew York

State law sets no dollar cap on deposits, but any money you pay before the job is substantially complete must go into an escrow account at a New York bank within 5 business days, or the contractor must instead give you a bond, indemnity contract or irrevocable letter of credit within 10 business days. If the contract does not name the bank, the contractor must tell you in writing where the money is within 10 business days (Lien Law 71-a(4)).

Official source: NY Senate, Lien Law Section 71-AAll New York contractor rules

PAPennsylvania

For contracts over $5,000, the contractor cannot take a deposit of more than one-third of the contract price, plus the cost of special-order materials listed in the contract (HICPA Section 9). No payment of any kind can be demanded before the contract is signed.

Official source: Pennsylvania General Assembly, Home Improvement Consumer Protection Act (Act 132 of 2008)All Pennsylvania contractor rules

TNTennessee

A Home Improvement contractor cannot require a down payment of more than one-third (1/3) of the total contract price.

Official source: Tennessee Board for Licensing Contractors, Home Improvement Application Requirements and ProcessAll Tennessee contractor rules

VTVermont

If the contract sets a maximum price, the down payment can be no more than one-half of the labor cost or one-half of the materials price, whichever is greater. On a time-and-materials contract with no maximum, the down payment is whatever you negotiate (26 V.S.A. § 5509(c)).

Official source: 26 V.S.A. § 5509, Insurance; contractsAll Vermont contractor rules

VAVirginia

No legal cap on deposits was found. The Board for Contractors recommends a down payment of about 10% of the total contract cost, or about 30% when custom-made items are needed.

Official source: Virginia Board for Contractors, Statement of Consumer Protections (effective 07/01/2025)All Virginia contractor rules

No statewide limit found

In these 38 places we looked in official sources and didn't find a statewide cap on home improvement deposits. Cities, counties or other rules (like contractor licensing) may still apply, so check your state's page.

What to do with a big deposit request

  • Ask what the deposit pays for. Special-order materials are a fair reason; general start-up costs are a reason to keep it small.
  • Tie later payments to finished work you can see, not to dates on a calendar.
  • Pay by check or card, never cash, and get a receipt.
  • Ask for lien releases from suppliers and subcontractors as you pay.
  • Get the deposit amount, due date and refund terms written into the contract.

More on payments

Questions about contractor deposits

How much deposit should a contractor ask for?
There's no single right number. Where a state sets a limit, the contract has to stay under it. Where it doesn't, a smaller deposit with payments tied to finished work keeps more of your money safe until the work is done.
Is it legal for a contractor to ask for 50% up front?
It depends on your state. California, for example, caps most home improvement down payments at $1,000 or 10% of the price, whichever is less. Many states have no statewide cap. The table above lists each rule with its official source.
What if my contractor already took more than the limit?
Talk to the contractor first and ask to change the payment terms in writing. If that doesn't work, your state's contractor licensing agency or attorney general is the place to ask. Each state page lists where to complain.
Does the limit apply to materials?
Some states treat special-order materials differently. Read the rule for your state and its official source, and ask the contractor to list what the deposit buys.

Want a person to check your whole bid?

The $99 Bid Review checks your deposit against your state's rule, plus 36 other items, with sources. A person checks every finding, and you get it in 2 business days.

Contractor deposit limits by state (2026) | OwnersBack